Plot: 30-36

Building

Building Plot: 30-36

Chittagong, Bangladesh

Talisman Performance Ltd

Details

Icon-transparency Transparency

This building has a 2 year timeline with 2 green activities including a LEED Gold certification.

Timeline

Talisman Performance Ltd
awarded on 09/26/2025
Gold
LEED v4 BD+C NC
Talisman Performance Ltd
registered on 01/22/2024
Registered
LEED v4 BD+C NC

Resources

Building Details

Space Type(s) Industrial Manufacturing
Report a Data Problem