17791 Perris Blvd

Building

Building 17791 Perris Blvd

Moreno Valley, CA, USA

MVDC Phase II Expansion

Details

Icon-transparency Transparency

This building has a 3 year timeline with 2 green activities including a LEED Silver certification.

Timeline

MVDC Phase II Expansion
awarded on 06/13/2018
Silver
LEED NC 2009
MVDC Phase II Expansion
registered on 10/24/2016
Registered
LEED NC 2009

Walk Score®: 6/100

Transit Score®: 0/100

Resources

Building Details

Owner Type(s) Investor: REIT, Publicly traded
Space Type(s) Warehouse and Distribution
CBSA Riverside-San Bernardino-Ontario, CA
USGBC Chapter Inland Empire Chapter
EPA Region Pacific Southwest
NHCS Urban Rural Classification Large central metro
Report a Data Problem