k. Będzina

Building

Building k. Będzina

Akacjowa 11, Psary, Poland

FM Logistic Bedzin Stage 5

Details

Icon-transparency Transparency

This building has a 3 year timeline with 2 green activities including a LEED Gold certification.

Timeline

FM Logistic Bedzin Stage 5
awarded on 11/07/2024
Gold
LEED v4 BD+C WDC
FM Logistic Bedzin Stage 5
registered on 08/09/2022
Registered
LEED v4 BD+C WDC

Walk Score®: 95/100

Resources

Building Details

Space Type(s) Warehouse and Distribution
Report a Data Problem