Bierutowska 44

Building

Building Bierutowska 44

Wrocław, Poland

Align Production Factory

Details

Icon-transparency Transparency

This building has a 3 year timeline with 2 green activities including a LEED Gold certification.

Timeline

Align Production Factory
awarded on 08/14/2023
Gold
LEED v4 BD+C NC
Align Production Factory
registered on 05/27/2021
Registered
LEED v4 BD+C NC

Walk Score®: 55/100

Resources

Building Details

Owner Type(s) Corporate: Privately Held
Space Type(s) Industrial Manufacturing
Report a Data Problem