Goethestraße 11

Building

Building Goethestraße 11

München, Germany

The Stack, The Stack - Precertification

Details

Icon-transparency Transparency

This building has a 3 year timeline with 2 green activities.

Timeline

The Stack - Precertification
registered on 03/22/2024
Registered
LEED v4 BD+C NC
The Stack
registered on 06/23/2022
Registered
LEED v4 BD+C NC

Resources

Building Details

Owner Type(s) Corporate: Privately Held
Space Type(s) Office
Report a Data Problem