Ras Al Hamra Terrace house TR/3BR Amin-0

Building

Building Ras Al Hamra Terrace house TR/3BR Amin-0

Muscat, 100, OM

Ras Al Hamra Terrace House TR/3BR

Details

Icon-transparency Transparency

This building has a 2 year timeline with 2 green activities including a LEED Platinum certification.

Timeline

Ras Al Hamra Terrace House TR/3BR
reported on 07/19/2021
Platinum
LEED v4.1 BD+C:Residential Single Family
Ras Al Hamra Terrace House TR/3BR
reported on 02/17/2020
Registered
LEED v4.1 BD+C:Residential Single Family

Resources

Building Details

Space Type(s) Single-Family Home
Report a Data Problem