8

Building

Building 8

Medan Bayan, Bayan Lepas, Pulau Pinang, Malaysia

Intel PGP14

Details

Icon-transparency Transparency

This building has a 3 year timeline with 2 green activities including a LEED Gold certification.

Timeline

Intel PGP14
reported on 10/14/2024
Gold
LEED v4.1 O+M: EB
Intel PGP14
reported on 11/29/2022
Registered
LEED v4.1 O+M: EB

Walk Score®: 92/100

Resources

Building Details

Owner Type(s) Corporate: Privately Held
Space Type(s) Other
Report a Data Problem