500 Edgewood Ave

Building

Building 500 Edgewood Ave

Akron, OH, USA

Bear and Otter Building, Komodo Kingdom Cafe at Akron Zoological Park, Pride of Africa Expansion + 1 more

Details

Icon-transparency Transparency

This building has a 13 year timeline with 5 green activities including a LEED Silver certification.

Timeline

Akron Zoological Park - Animal Hospital
registered on 02/21/2024
Registered
LEED v4 BD+C NC
Pride of Africa Expansion
registered on 02/19/2024
Registered
LEED v4 BD+C NC
Bear and Otter Building
awarded on 03/17/2014
Silver
LEED NC 2009
Bear and Otter Building
registered on 11/08/2012
Registered
LEED NC 2009

Walk Score®: 55/100

Resources

Building Details

Owner Type(s) Non-Profit (that do not fit into ot
Space Type(s) Public Assembly, Other
CBSA Akron, OH
USGBC Chapter Northeast Ohio Chapter
EPA Region Great Lakes
ASHRAE Climate Zone ASHRAE Climate Zone #5
NHCS Urban Rural Classification Medium metro
Utility Provider Ohio Edison Co.
Report a Data Problem