93 Panther Paws Trail

Building

Building 93 Panther Paws Trail

Kissimmee, FL, USA

Gateway High School, Gateway Logistics at 429 Phase I - Bldg

Details

Icon-transparency Transparency

This building has a 1 year timeline with 3 green activities.

Timeline

Gateway Logistics at 429 Phase I - Bldg
registered on 10/30/2023
Registered
LEED v4 BD+C WDC
Gateway Logistics at 429 Phase I - Bldg
registered on 10/30/2023
Registered
LEED v4 BD+C WDC
Gateway Logistics at 429 Phase I - Bldg
registered on 10/30/2023
Registered
LEED v4 BD+C WDC
Gateway High School
NCES Public Schools

Resources

Building Details

Space Type(s) Warehouse and Distribution
CBSA Orlando-Kissimmee-Sanford, FL
USGBC Chapter Central Florida Chapter
EPA Region Southeast
ASHRAE Climate Zone ASHRAE Climate Zone #2
NHCS Urban Rural Classification Large fringe metro
Utility Provider Florida Power Corp.
school level High
lowest grade taught 9th Grade
highest grade taught 12th Grade
school type Regular School
charter school No
operational status Open
total enrollment 2300
Report a Data Problem