Rite Of Passage

Building

Building Rite Of Passage

Yerington, CA, 89447, USA

Details

Icon-transparency Transparency

This building has a 1 year timeline with 1 green activity.

Timeline

Rite Of Passage
reported on 01/01/2012
Solar Installed
The Solar Foundation National Solar Schools Census
Rite Of Passage
NCES Public Schools

Walk Score®: 8/100

Resources

Building Details

CBSA Fernley, NV
USGBC Chapter Nevada Chapter
EPA Region Pacific Southwest
NHCS Urban Rural Classification Micropolitan (nonmetropolitan)
Utility Provider Sierra Pacific Power Co.
school level High
lowest grade taught 9th Grade
highest grade taught 12th Grade
school type Alternative/Other School
charter school Yes
operational status Open
total enrollment 223
solar capacity kw 250.00
system type PV
year installed 2012
installer Black Rock Solar
primary funding type Grant/Donation
installed cost $1,159,161.00
costwatt $4.64
lowest grade 9th Grade
highest grade 12th Grade
total students 200
Report a Data Problem