Arabellastraße 4

Building

Building Arabellastraße 4

München, Germany

BayWa Anbau BT-C, BayWa Hochhaus BT-A

Details

Icon-transparency Transparency

This building has a 5 year timeline with 4 green activities including a LEED Gold certification.

Timeline

BayWa Hochhaus BT-A
awarded on 04/03/2019
Gold
LEED CS 2009
BayWa Anbau BT-C
awarded on 03/07/2019
Gold
LEED CS 2009
BayWa Hochhaus BT-A
registered on 01/28/2015
Registered
LEED CS 2009
BayWa Anbau BT-C
registered on 01/28/2015
Registered
LEED CS 2009

Walk Score®: 89/100

Resources

Building Details

Owner Type(s) Corporate: Privately Held
Space Type(s) Office
Report a Data Problem